Product
Munkaengedély.hu
Switch from paper-based work permits to a digital platform. Online approval process, real-time status tracking, full regulatory compliance.
PERMIT TO WORK PLATFORM
No one gets a permit for work they're not currently qualified to do.
Digital permit to work management for industrial sites: guided permit issuing, automatic competency checks, area-based hazards, and a complete audit trail.
During a maintenance shutdown, dozens of permits go out every day — for hot work, work at height, confined space entry. On paper there's no visibility: an expired certification doesn't surface in time, and afterwards there's no way to reconstruct who authorised what.
1. Guided permit issuing
Step by step: activity, area, people involved, hazards, conditions. A step can't be skipped, and it can't be filled in wrong.
2. The system checks competencies
Every worker has their training and certifications on file, with expiry dates. If one has lapsed, the permit can't be issued to them. The warning comes before the work, not after the incident.
3. Plant, area, hazard
Your site structure is mapped: plants, areas, and the standing hazards attached to each. The permit is built on that — not on what the issuer happens to remember.
Book a 20-minute walkthrough — applied to your own process, not a slide deck.
No one gets a permit for work they're not currently qualified to do.
Digital permit to work management for industrial sites: guided permit issuing, automatic competency checks, area-based hazards, and a complete audit trail.
During a maintenance shutdown, dozens of permits go out every day — for hot work, work at height, confined space entry. On paper there's no visibility: an expired certification doesn't surface in time, and afterwards there's no way to reconstruct who authorised what.
1. Guided permit issuing
Step by step: activity, area, people involved, hazards, conditions. A step can't be skipped, and it can't be filled in wrong.
2. The system checks competencies
Every worker has their training and certifications on file, with expiry dates. If one has lapsed, the permit can't be issued to them. The warning comes before the work, not after the incident.
3. Plant, area, hazard
Your site structure is mapped: plants, areas, and the standing hazards attached to each. The permit is built on that — not on what the issuer happens to remember.
Book a 20-minute walkthrough — applied to your own process, not a slide deck.